| 1 2 3 4 |
| Patent ID | Title | Date Filed |
| 7089077 | Monitor wafer purchase and controls database
| July 6, 2005 |
| 7089070 | Method and arrangement for a system for manufacturing dental products
| November 8, 2000 |
| 7085704 | Time-indexed multiplexing as an efficient method of scheduling in hardware
| May 7, 2002 |
| 7069096 | Global resource locator for autonomous cooperative control systems
| July 24, 2000 |
| 7065421 | Manufacturing management system and method
| June 9, 2004 |
| 7065419 | Job flow Petri Net and controlling mechanism for parallel processing
| April 14, 2004 |
| 7064848 | System and method for converting print jobs stored in printshop job description language files into printshop workflow
| December 12, 2000 |
| 7054703 | Control system and methods for managing a production operating under time constaraints
| September 9, 2003 |
| 7054702 | Lot start agent that determines delta virtual WIP time for each bottleneck station in a multi-product and multi-bottleneck manufacturing environment
| April 1, 2002 |
| 7054699 | Process management system and production management system
| March 8, 2005 |
| 7050873 | System and method for dynamic multi-objective optimization of machine selection, integration and utilization
| October 20, 2004 |
| 7047091 | Method for determining a graphic presentation for visualizing progress of a project
| June 6, 2003 |
| 7043444 | Synchronization of planning information in a high availability planning and scheduling architecture
| April 13, 2001 |
| 7043320 | Method and apparatus for planning a manufacturing schedule using an adaptive learning process
| May 14, 2004 |
| 7043319 | System and method for visualizing the use of resources in a process system
| September 30, 2003 |
| 7043318 | Lot start agent that determines quantity and timing for lot starts
| May 23, 2002 |
| 7043317 | Semiconductor wafer fabrication furnace idle monitor and method of operation
| October 30, 2003 |
| 7043316 | Location based programming and data management in an automated environment
| February 14, 2003 |
| 7043309 | Distributed actuation allocation for large assemblies of implementation units
| April 6, 2001 |
| 7039482 | Floating process flow control system to handle operation events in a full automation plant
| October 28, 2003 |
| 7039481 | Production planning system
| February 4, 2003 |
| 7039480 | Planning operation management support system, and planning operation management support program
| March 23, 2005 |
| 7035705 | System and method for process contamination prevention for semiconductor manufacturing
| March 3, 2004 |
| 7035704 | Capacity management system and method
| November 16, 2004 |
| 7031786 | System and method for fabrication backup planning
| March 25, 2004 |
| 7031785 | Method of production control and method of manufacturing electronic apparatus
| March 18, 2003 |
| 7027885 | Determining batch start versus delay
| December 30, 2002 |
| 7024371 | High availability planning and scheduling architecture
| April 13, 2001 |
| 7020534 | Recycling method
| May 28, 2004 |
| 7003368 | Manufacturing method for a plurality of manufacturing lots
| March 25, 2004 |
| 7003365 | System and method of reserving capacity for a pre-process order
| December 2, 2004 |
| 6999829 | Real time asset optimization
| December 26, 2001 |
| 6993400 | System and method for real-time assignment of jobs to production cells
| March 7, 2003 |
| 6990458 | System and method for computer-aided technician dispatch and communication
| August 28, 1997 |
| 6990381 | Electrically controlled apparatus
| December 5, 2002 |
| 6983190 | Method for optimizing material substitutions within a supply chain
| October 22, 2003 |
| 6983188 | Scheduling system
| April 16, 2004 |
| 6978222 | Method of determining level of effect of system entity on system performance, by use of active time of same entity
| March 25, 2002 |
| 6975915 | Cooperative smart items
| October 31, 2002 |
| 6970756 | Computer-assisted pull flow production management method
| February 25, 2004 |
| 6968248 | Agent reactive scheduling in an automated manufacturing environment
| June 13, 2005 |
| 6968245 | Flexible recipe modeling and recipe cluster management system
| August 13, 2002 |
| 6965867 | Methods and apparatus for allocating, costing, and pricing organizational resources
| December 13, 1999 |
| 6961634 | System and method for allocating multi-function resources for a wetdeck process in semiconductor wafer fabrication
| May 28, 2003 |
| 6959405 | Method and system for concurrent error identification in resource scheduling
| April 18, 2001 |
| 6959225 | Graphical user interface for allocating multi-function resources in semiconductor wafer fabrication and method of operation
| May 28, 2003 |
| 6957114 | Graphical user interface for compliance monitoring in semiconductor wafer fabrication and method of operation
| June 16, 2003 |
| 6957113 | Systems for allocating multi-function resources in a process system and methods of operating the same
| November 19, 2002 |
| 6954874 | Diagnostic method and diagnostic system for monitoring available resources in a production process
| May 6, 2002 |
| 6928333 | Scheduling method for automated work-cell transfer system
| August 31, 1999 |
| 6917848 | Production system for printed wiring board
| November 20, 2000 |
| 6907305 | Agent reactive scheduling in an automated manufacturing environment
| April 30, 2002 |
| 6907304 | Method and apparatus of measuring a relative utility for each of several different tasks based on identified system goals
| April 7, 2000 |
| 6904329 | Method and apparatus for generating a multi-dimensional cost function
| August 30, 2002 |
| 6898476 | Management of working status with large-scaled display
| May 16, 2001 |
| 6898475 | System and method utilizing temporal constraints to coordinate multiple planning sessions
| May 27, 2004 |
| 6898472 | System and method for order group planning with attribute based planning
| November 5, 2002 |
| 6895292 | Predictive and preemptive planning and scheduling for different job priorities system and method
| April 28, 2003 |
| 1 2 3 4 |